Hongyuan New Materials (Baotou) Co., Ltd. Integrated Plant Construction Project (Phase I, Phase II, Phase III)

Release time: 2024.03.04
 Number of visits: 26

The general contract project is a key demonstration project extending downstream of the photovoltaic monocrystalline silicon industry chain in Inner Mongolia Autonomous Region. Hongyuan New Materials (Baotou) Co., Ltd. has completed the construction and commissioning of three phases of the project, achieving a production capacity of 30GW for crystal pulling and 20GW for slicing. This has elevated the company to a leading supplier in the industry, with profits per watt ranking among the top tier.

The project is located in the Equipment Manufacturing Industrial Park in Qingshan District, Baotou, Inner Mongolia Autonomous Region.

Phase I comprises 792 monocrystalline furnaces, including 140/160 model furnaces. Construction includes areas A and B of the monocrystalline workshop, a washing workshop, cafeteria, office area, etc.

Phase II consists of 792 monocrystalline furnaces, all of the 160 model. Construction includes the monocrystalline workshop, outdoor and auxiliary rooms, office area, outdoor corridors, etc.

Phase III involves 216 of the latest model slicing machines. Construction includes the slicing workshop, solid waste warehouse, outdoor and auxiliary rooms, process circulation cooling water pool, etc.

 

  • toolbar
    Back to Top
亚洲AV无码不卡一区二区三区|亚洲美G性爱视频|色婷婷亚洲六月婷婷中文字幕|综合色彩设计手册|亚洲精品gv天堂无码男同|香蕉午夜福利院 扬州市| 肇州县| 洞口县| 广州市| 谢通门县| 社会| 祁阳县| 独山县| 稻城县| 洪洞县| 库伦旗| 肇东市| 扎赉特旗| 布尔津县| 东丽区| 金阳县| 丰城市| 资讯| 玉门市| 寿宁县| 凯里市| 大名县| 宁都县| 达州市| 喀喇| 宁夏| 富蕴县| 济南市| 洱源县| 洛川县| 顺义区| 都安| 荃湾区| 大方县| 汉寿县| 建瓯市| 无锡市| 北辰区| 安平县| 松潘县| 鞍山市| http://444 http://444 http://444 http://444 http://444 http://444