Hongyuan New Materials (Baotou) Co., Ltd. Monocrystalline Silicon Crystal Pulling (Phase IV) Project

Release time: 2024.03.06
 Number of visits: 30

The general contract project is a turnkey project located in the Equipment Manufacturing Industrial Park on Equipment Avenue in Qingshan District, Baotou City, Inner Mongolia Autonomous Region. It is approximately 4 kilometers away from the first, second, and third phases of the Hongyuan project. The total project covers an area of 800 acres and is divided into two phases of construction. The current construction project is the 20GW monocrystalline plant (referred to as the Hongyuan Phase IV project), covering a total area of 298 acres. It includes 1600 monocrystalline furnaces and comprises a comprehensive plant area of 260,000 square meters (including 2 monocrystalline workshops, 1 machining workshop, and 1 cleaning workshop), as well as a chemical warehouse of 1226 square meters. The project is scheduled to commence in April 2023 and be completed in March 2024, with an estimated duration of approximately 12 months. As a major project in Qingshan District, Baotou City in 2023, the Phase IV of Hongyuan project will create a "siphon effect" on the surrounding markets, laying the foundation for further market development.

 

  • toolbar
    Back to Top
亚洲AV无码不卡一区二区三区|亚洲美G性爱视频|色婷婷亚洲六月婷婷中文字幕|综合色彩设计手册|亚洲精品gv天堂无码男同|香蕉午夜福利院 滦南县| 任丘市| 彝良县| 临沂市| 依安县| 大关县| 竹山县| 五家渠市| 浦城县| 揭阳市| 伽师县| 建瓯市| 通山县| 营山县| 马尔康县| 八宿县| 来宾市| 赤壁市| 长沙县| 柘荣县| 苏尼特右旗| 启东市| 密山市| 石柱| 鲁山县| 城市| 郑州市| 宣武区| 邵东县| 海晏县| 龙门县| 景宁| 丰镇市| 余庆县| 原平市| 丰城市| 鹤庆县| 五家渠市| 娱乐| 克山县| 时尚| http://444 http://444 http://444 http://444 http://444 http://444