Hongyuan New Materials (Baotou) Co., Ltd. Monocrystalline Silicon Crystal Pulling (Phase IV) Project

Release time: 2024.03.06
 Number of visits: 30

The general contract project is a turnkey project located in the Equipment Manufacturing Industrial Park on Equipment Avenue in Qingshan District, Baotou City, Inner Mongolia Autonomous Region. It is approximately 4 kilometers away from the first, second, and third phases of the Hongyuan project. The total project covers an area of 800 acres and is divided into two phases of construction. The current construction project is the 20GW monocrystalline plant (referred to as the Hongyuan Phase IV project), covering a total area of 298 acres. It includes 1600 monocrystalline furnaces and comprises a comprehensive plant area of 260,000 square meters (including 2 monocrystalline workshops, 1 machining workshop, and 1 cleaning workshop), as well as a chemical warehouse of 1226 square meters. The project is scheduled to commence in April 2023 and be completed in March 2024, with an estimated duration of approximately 12 months. As a major project in Qingshan District, Baotou City in 2023, the Phase IV of Hongyuan project will create a "siphon effect" on the surrounding markets, laying the foundation for further market development.

 

  • toolbar
    Back to Top
亚洲AV无码不卡一区二区三区|亚洲美G性爱视频|色婷婷亚洲六月婷婷中文字幕|综合色彩设计手册|亚洲精品gv天堂无码男同|香蕉午夜福利院 萝北县| 盘山县| 平遥县| 吴旗县| 清水河县| 丹巴县| 潮安县| 乌拉特中旗| 阿城市| 平安县| 竹山县| 彰武县| 高州市| 读书| 涿州市| 鄂州市| 嘉义县| 塘沽区| 河南省| 巨野县| 武陟县| 翁源县| 兴国县| 固安县| 盐源县| 章丘市| 广西| 阿尔山市| 项城市| 射洪县| 博客| 喀喇沁旗| 达拉特旗| 哈尔滨市| 海伦市| 迁安市| 高平市| 延安市| 嘉鱼县| 奉贤区| 大余县| http://444 http://444 http://444 http://444 http://444 http://444